Ircon Secures Rs 642 Crore Contract for Mumbai Metro Line-6 Power and Systems Work
MMRDA Awards Design and Maintenance Package Covering Traction, E&M, Lifts, Escalators for Swami Samarth Nagar–Vikhroli Corridor

Mumbai – Ircon International Limited has received a major contract from the Mumbai Metropolitan Region Development Authority (MMRDA) for Package-2 of Line-6 of the Mumbai Metro Rail Project. The scope includes design, supply, installation, integration, testing, and commissioning of power supply and traction systems, E&M works, lifts, and escalators.
Read here-BEML Secures Rs 185.65 Crore Defence Order for Bulldozer Supply
The work pertains to the metro corridor connecting Swami Samarth Nagar to Vikhroli (Eastern Express Highway) and includes five years of comprehensive maintenance following a two-year defect liability period.
Read here- Sachin Tendulkar: The Cricketing Legend Who Redefined the Game
| BEML Secures Rs 185.65 Crore Defence Order for Bulldozer Supply |
Key contract details:
-
Project Value: Rs 642.44 crore and Euro 2.78 million (inclusive of all duties except GST & Customs)
-
Execution Timeline: 104 weeks for build phase, followed by 2-year defect liability and 5-year maintenance
-
Contract Nature: Domestic works order under routine business operations
-
Awarding Authority: MMRDA
-
Promoter Interest: None
Read here-BEML Secures Rs 185.65 Crore Defence Order for Bulldozer Supply
This award strengthens Ircon’s portfolio in urban transport infrastructure and affirms its role in powering India’s metro growth.
Read here- Sachin Tendulkar: The Cricketing Legend Who Redefined the Game
