SECI DRDO Solar Partnership for Energy Neutrality and Net Zero Carbon

psu connect
13 September 2025 at 12:00:00 am
SECI and DRDO have signed an agreement to generate 250 MW of solar power under the National Solar Mission. This initiative will support DRDO’s transition into a Green Organisation and reduce energy costs.
SECI DRDO Solar Partnership for Energy Neutrality and Net Zero CarbonSolar energy panels to be installed on 402 acres at Aeronautical Test Range in Chitradurga to support DRDO labs nationwide
An MoU has been signed between the Solar Energy Corporation of India (SECI) and DRDO as part of the National Solar Mission. This effort aims to achieve energy neutrality and Net Zero Carbon goals. The plan is to generate 250 MW of solar power, which will make DRDO a Green Organisation.
 
 

As part of this initiative, a land use agreement has been signed to transfer 402 acres of land at the Aeronautical Test Range in Chitradurga, Karnataka, to SECI. This land will help produce 100 MW of solar power for DRDO labs across the country at lower rates.

Shares
facebook sharing buttonShare
twitter sharing buttonTweet
whatsapp sharing buttonShare
linkedin sharing buttonShare